gogogo高清在线播放_韩国女主播5号房子_日本理论片中文字幕三级_在线观看色视频网站_丝袜人妻中文字幕一区二区_色墦影院私人影院免费_视频这里只有精品免费_成人黄色视屏观看品尚网_少妇厨房愉情理9仑片_中国一级特黄刺激刺激爽

Welcome to Guangdong Yutong Precision Machinery Co., Ltd

Guangdong Yutong Precision Machinery Co., Ltd.

Is a research and development, production, sales as one of the focus on
high-precision forming surface grinder manufacturer

National hotline:
400-0989-870
Product Center PRODUCT

Basic steps before delivery of surface grinder

Published on: 2021-07-07 15:35:34   Number of Views: 759

After the new machine tool arrives at the customer, the customer will first notify Oka Lianye, and then communicate about the landing. However, pay attention to the following items when landing.

1、 Preparation:

? the foundation shall meet the requirements according to the foundation drawing, which is sufficient to support the levelness and firmness of the machine tool.

? contact qualified professional handling and hoisting companies for hoisting. Oka Lianye provides special slings for each machine tool and hoists according to the hoisting drawing. If the customer does not purchase the spreader, he needs to prepare a steel wire rope with sufficient strength or a forklift with sufficient load.

Landing steps:

1) Open the box, check whether each packing box is obviously damaged, and count the items according to the delivery list.

2) When handling the main body of the machine tool, if the forklift is used, please adjust the shovel entry position to make the center of gravity of the machine tool stable, so as to avoid machine and personal injury caused by the inclination of the machine tool; During shoveling, any part of the machine tool shall be kept at least 15cm away from the forklift to prevent scratching the sheet metal.

3) The main body of the machine tool shall be placed in place according to the foundation dimension drawing, leaving space for placing other peripheral equipment of the machine tool; All anchors shall be supported at approximately the same height, and there shall be no suspended anchors to prevent deformation of the machine tool.

4) Peripheral equipment shall be placed in place, including transformer, dust box, water mill, etc. the specific placement position shall be in accordance with the placement drawing provided in advance. If it is unclear, contact okaliano company at any time for consultation. After the standby bed is in place, it can be installed and debugged.


Home page  |   About  |  Product  |  News  |  Workshop  |  Customer witness  |  Common problem  |   Contact

Copyright ? Copyright 2021 Guangdong Yutong Precision Machinery Co., Ltd
Telephone:13929209870   Fax:0769-81871789
Address:East Gate, No. 75, Fuhai Road, Xiagang, Chang'an Town, Dongguan  Yue ICP Bei ******* No